Company: Palm Oleo Sdn. Bhd.
General Information:
Hexagon was awarded the contract for installation for internal piping and associated equipment installation work on part of Lot 1245, Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd.
Project: Palm Oleo Expansion Project III
Year: 2002
Application: Oleo Chemical Plant
Materials: SS316, SS316L, SS317, SS317L Carbon Steel
Dimension: 1/2" - 8" |
|


|
Company: Ondeo Degremont (M) Sdn. Bhd.
End User: Syarikat Air Johor
Project: Semangar Water Supply Scheme
Scope of work:
Design, Engineering, Fabrication and Installation 3nos. of Aluminium Sulphate Tanks c/w 6mm of Rubber Lining
Design, Engineering, Fabrication and Installation 2nos. of Lime Silos at Semangar Site (Kota Tinggi, Johor) |
|


|
Company: Ondeo Degremont (M) Sdn. Bhd.
End User: PUB, Singapore
Project: Johor River Water Works, Stage 4 & 5
Scope of work:
Installation Of Equipment, Stainless Steel Pipes, Mild Steel Cement Lined Pipes, at Ozone Production Building.
Installation of Raw Water Pump & Cement Lined Pipes
Installation of Chemical Pipe Line System
Installation of Service Water Pipe (Mild Steel Painted) - Chemical Plant House |
|


|
Company: 1st Silicon
Project: Process Drain up System & Hook-Up
Application: To transfer waste water to wafer fab tools to designated waste water treatment plant.
Materials: CPVC, SS304L
Dimension: 4"-12”, 3"-6"
Scope of work:
To fabricate and install a piping system for Ultra Pure Water & Waste Water Treatment Plant Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd. |
|


|
Company: Sembawang (M) Sdn. Bhd.
Project: FRP Pipe Spools for Santa Rita 1000 MW CCPS
Specification: To supply and fabricate FRP Pipe Spools
Application: Transfer of Chemical
Materials: PN10 Filament Wound FRP Pipes based on Vinyl ester resin.
Total Length: 2400mm Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd. Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd. |
|


|
Company: Samsung Engineering
General Information:
Hexagon was awarded the project for FRP Piping Tie-Inwork at GPP2 & 3, for Kerteh Liquefaction Plant, owned by Hydro Gas (M) Sdn Bhd.
Project: FRP Piping Tie-In Work for Co Liquefaction Plant
Specification: To supply and install FRP Pipe and stainless steel piping, pipe support, service platform, condensate pot.
Application: Transfer wet CO gas
Materials: Filament wound FRP Pipes based on vinyl ester resin for corrosion barrier and isophthalic polyster for structural layer |