Project HighlightsIndustrial Piping Wednesday, September 08, 2010
 

  hexagon-tower-PH.jpg

palmoleo1.jpg

palmoleo2.jpg

Company: Palm Oleo Sdn. Bhd.

General Information:

Hexagon was awarded the contract for installation for internal piping and associated equipment installation work on part of Lot 1245, Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd.

Project: Palm Oleo Expansion Project III

Year: 2002

Application: Oleo Chemical Plant

Materials: SS316, SS316L, SS317, SS317L Carbon Steel

Dimension: 1/2" - 8"

semangar1.jpg

semangar2.jpg

Company: Ondeo Degremont (M) Sdn. Bhd.

End User: Syarikat Air Johor

Project: Semangar Water Supply Scheme

Scope of work:

Design, Engineering, Fabrication and Installation 3nos. of Aluminium Sulphate Tanks c/w 6mm of Rubber Lining

Design, Engineering, Fabrication and Installation 2nos. of Lime Silos at Semangar Site (Kota Tinggi, Johor)

pub1.jpg

pub2.jpg

Company: Ondeo Degremont (M) Sdn. Bhd.

End User: PUB, Singapore

Project: Johor River Water Works, Stage 4 & 5

Scope of work:

Installation Of Equipment, Stainless Steel Pipes, Mild Steel Cement Lined Pipes, at Ozone Production Building.

Installation of Raw Water Pump & Cement Lined Pipes

Installation of Chemical Pipe Line System

Installation of Service Water Pipe (Mild Steel Painted) - Chemical Plant House

1sta.jpg

1st 01.jpg

Company: 1st Silicon

Project: Process Drain up System & Hook-Up

Application: To transfer waste water to wafer fab tools to designated waste water treatment plant.

Materials: CPVC, SS304L

Dimension: 4"-12”, 3"-6"

Scope of work:

To fabricate and install a piping system for Ultra Pure Water & Waste Water Treatment Plant Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd.

sembawang1.jpg

sembawang2.jpg

Company: Sembawang (M) Sdn. Bhd.

Project: FRP Pipe Spools for Santa Rita 1000 MW CCPS

Specification: To supply and fabricate FRP Pipe Spools

Application: Transfer of Chemical

Materials: PN10 Filament Wound FRP Pipes based on Vinyl ester resin.

Total Length: 2400mm   Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd.  Kundang Industrial Estate, Rawang - For M/S Palm Oleo Sdn Bhd.

samsung1.jpg

samsung2.jpg

Company: Samsung Engineering

General Information:

Hexagon was awarded the project for FRP Piping Tie-Inwork at GPP2 & 3, for Kerteh Liquefaction Plant, owned by Hydro Gas (M) Sdn Bhd.

Project: FRP Piping Tie-In Work for Co Liquefaction Plant

Specification: To supply and install FRP Pipe and stainless steel piping, pipe support, service platform, condensate pot.

Application: Transfer wet CO gas

Materials: Filament wound FRP Pipes based on vinyl ester resin for corrosion barrier and isophthalic polyster for structural layer