Company: Shell Malaysia Trading Sdn. Bhd.
Project: Construction of New Bitumen Storage Facilities Tank No.12 at Tanjung Gelang Installation
Introduction: Hexagon was awarded to construct a 3000m3 carbon steel storage tank for bitumen (15m diameter * 18m height)
Work Scope: Includes construction of the tank foundation, erection and tank, insulation, piping and electrical instrumentation. |


|
|
Company: Aldwich Enviro Management Sdn. Bhd.
Project: Engineering, Procurement & Construction (EPC) Contractor to Build Waste Oil to Diesel Plant
Year: 2003
Intro:
Hexagon secured a contract from Aldwich Enviro Management Sdn. Bhd. to build a Waste Oil to Diesel Plant Tank Farm (Package III) in Kemaman, Terengganu. The Project involves Design & Construction of the following auxiliary facilities.
A) Office Building B) Workshop C) Tank Farm D) Loading / Unloading Gantries & Pump House E) Boiler System F) Wastewater Treatment Plant G) Fire Prevention and Protection Systems H) Infrastructure ( Roads, Landscaping, Drainage, Lighting, etc) I) MCC Panel and Electrical Works J) Instrument air and compressed air K) Control interface L) Gen-Set M) Nitrogen Supply N) Natural Gas Supply
Work Scope: Design and Build
Application: Waste Oil to Diesel Plant |


|
|
Company: Acqutek Electronic Sdn. Bhd.
Project: Civil & Structural Works
- Civil & StructuralWorks - Mechanical& ElectricalWorks - WasteWater Treatment - Air Pollution Control - Cleanroom Environment - Equipment Supply
Application: Leadframe Manufacturing Plant
Material:
Piping - PVC, ABS, Stainless Steel, Carbon Steel Lining - FRP, Kerraplan - EM, HDPE The Project involves Design & Construction of the following auxiliary facilities.
|


|
|
Company: Rekayasa Industri (M) Sdn. Bhd.
Project: NPK Fertilizer Plant
Year: 2003
1) Provision of Document, Material Supply, Fabrication, Painting, packaging and Transportation 2) Supply of PP/FRP materials (pipes, Fittings and Flanges) 3) Design , Fabrication and Supply of SR-214 Final Tail Gas Scrubber 4) Design, Fabrication and Supply of FRP Duct & Tank 5) Design, Fabrication and Supply of Bins & Bin Gate 6) Design, Fabrication and Supply Of Duct, Chute & Hopper 7) Design, Fabrication and Supply of Internal Column, Filling Material 8) Design, Fabrication and Supply of Fabricated Scrubber II 9) Design, Fabrication and Supply Of Scrubber & Platform Ladder III Fabrication and Supply Of Scrubber & Platform Ladder III |


|
|
Company: CCM Chemicals Sdn. Bhd.
Project: Engineering, Procurement & Construction (EPC) Contractor to build PIX & PAX Coagulants Plant
Year: 1997
Intro:
Hexagon secured a contract from CCM Chemicals Sdn Bhd to build PIX & PAX Coagulant Plant in Pasir Gudang, Johor. The project involves Piping, Air Pollution Control Systems, Corrosion Control, fabrication of Storage Tanks, supply of Engineering Plastics, fabrication & supply of FRP Pultruded Products, Plastic & Steel fabrication, Civil Work and Electrical Instrumentation.
Application: Water Treatement Coagulant Material: FRP, ABS, PVC, CPVC, Steel (A333, S304/316, G.I-C) |


|
|
Company: BDAG Blacke-Durr
Project: Cooling Tower
Year: 1994
Intro: This Contract was awarded by BDAG Blacke-Durr. The project involves the supply of materials & labour for the installation of Cooling Tower and related Pipework.
Application: Integral part of the Genting Sanyen 'Combined Cycle Power Plant
Material:
a) Hot Dipped Galvanised Iron Bolts, Nuts, Splices, Ladders, Gear Box Base Plates
b) 40pcs balanced Alpine FRP Blades, 10 Flender Gear Boxes, 10 units ABB 175W 3 phase motor
c) 100 units, Titanium Tube, Deutsh Babcock Heat Exchangers
d) 40 container Loads of assorted Tanalised Timber
e) 200mm -700mm N10 FRP ISO Pipes with estimated 2,700m in length |


|