Company: Rosner Mauntby Meditrade Co. Ltd.
Scope of Work: System Design, Fabrication and Installation
Application: 12000 cfm Scrubber for Chlorine Fume
Year: 2003 |
|

|
Company: Q-Dos Flexicircuits (M) Sdn. Bhd.
Scope of Work: System Design, Fabrication and Installation
Application: 7000cfm Scrubber for Electrolytic Nickel Gold Line
Year: 2003 |
|

|
Company: Shorruber (M) Sdn. Bhd.
Scope of Work: System Design, Fabrication and Installation
Application: 45000 cfm Scrubber for N.N-Dimethylformamide
Year: 2003 |
|
Company: SMCI Scope of Work: Design & Install Air Pollution Control System with Noise Enclosure, Inverter Control, Remote Signal & m/s Tray below Scrubber Application: Scrub Individual Plating Fume before Exhausting Out to Environment Year: 2000 |

|
|
Company: 1st Silicon
Scope of Work:
Solvent Exhaust
-G.I Longitudinal seam welded duct with METVLF + SR3 Flange -200mm - 1400mm round
General Exhaust
-G.I Spiral duct with METVAF + SR3 Flange -300mm - 1600mm round -2000 x 1100mm rectangular, 1900 x 900mm rectangular
Caustic & Acid Exhaust
-Fab Text Mapproved stainless steel teflon coated duct, ATS FMapproved FRP Duct -650mm - 1900mm
Application: Scrub Individual Plating Fume before Exhausting Out to Environment
Year: 2000 |


|
|
Company: Hunstman Tioxide
General Information:
Hexagons was awarded the Turnkey Contract to design, manufacture and erect this 2.5metre diameter x 50 metre high FRP stack, complete with steel support steel
The FRP Stack was designed and manufactured in accordance with BS 4994-1987 standard, and a high heat-distortion temperature vinyl ester resin was used in the construction. |
Back to Top
|
|
|
|
|
|
|
|
|